Nickel from Araguaia Project

Client: Horizonte Minerals

Sector: Mining

The Araguaia Project, owned by Horizonte Minerals, is located in Pará, 760 km from Belém (Brazil). The project encompasses an open-pit mining operation designed to extract nickel laterite from a Mineral Reserve of 27.5 Mt and a Mineral Resource of 119 Mt.

The facility’s projected annual output is 52,000 tonnes per annum (tpa) of ferronickel (FeNi) over a 31-year mine life. The metallurgical flowsheet utilizes a single-line Rotary Kiln-Electric Furnace (RKEF) process for the extraction of FeNi from laterite ore.

Key operational metrics include:
- Throughput Capacity: 900,000 dry metric tonnes of ore per year.
- Metal Yield: Approximately 15 ktpa of contained nickel.

The processing plant will feature a comprehensive circuit, including:
- Primary and secondary crushing stations.
- Feed homogenization systems.
- RKEF production line equipped with a rotary dryer.
- Tertiary crushing and dry feed storage.
- Reduction kilns and an electric smelting furnace.
- Ladle refining and granulation systems.
- FeNi dryer/classifier units.
- Dedicated metal storage and shipping facilities.

The final ferronickel product will be transported via road to the Port of Vila do Conde for international export.

Cooling Jackets | Project Overview: Gerdau Ouro Branco

Client: Gerdau

Sector: Steel

Basic Engineering for the cooling jacket systems to be implemented at Blast Furnace No. 1 (BF1) of the GERDAU OURO BRANCO plant, located in Ouro Branco, Minas Gerais, Brazil.

This is a multidisciplinary project encompassing Process, Utilities, Mechanical, Piping, Civil/Structural Concrete, Structural Steel, Electrical, and Automation engineering for the following systems:

- Industrial Water Pumping Station (Secondary Circuit): Pumping system featuring electric-driven equipment with diesel backup.
- Demineralized Water Pumping Station (Primary Circuit): Pumping system featuring electric-driven equipment with diesel backup.
– Estação de bombeamento de água desmineralizada (sistema primário) – Sistema de bombeamento com equipamentos elétricos e backup diesel;
- Cooling Tower Complex: Including the system’s pressure control and surge damping systems.
- Blast Furnace Shell Cooling System: Implementation of cooling jackets/staves for the Blast Furnace No. 1 shell.

New Crushing Plant Project

Client: Ferro+

Sector: Mining

Conceptual and Detailed Engineering for the implementation of a new Crushing & Screening line.

The scope includes comprehensive process development, including equipment sizing and a multidisciplinary engineering approach. Key project components include:
- Mechanically Stabilized Earth (MSE) Retaining Structures: Advanced containment solutions for the primary station.
- 90m³ ROM Hopper / Bin: Heavy-duty feed hopper configuration.
Rock Breaker: Integration of hydraulic breaking systems.
- Primary and Secondary Crushing Circuits: Optimized comminution stages.
- Screening Station: High-efficiency material classification.
- Conveyor Systems: Material handling and stockpiling solutions.

This was a multidisciplinary project executed using Integrated 3D Modeling (BIM/Digital Twin approach) across all engineering disciplines to ensure clash detection and constructability.

Medium Section Mill

Client: ArcelorMittal

Sector: Mining

Basic and detailed engineering for a new medium section mill with a nominal capacity of 400 ktpa, including infrastructure, mechanical, piping, electrical, automation, control, and instrumentation.

Stockyard 3 Expansion

Client: CSN

Sector: Steel

Engineering services for field surveys and multidisciplinary conceptual/basic design regarding the expansion of Stockyard 3 at the Solid Bulk Terminal (TECAR) in the Port of Itaguaí - Rio de Janeiro (Brazil).

Dust Suppressant Plant

Client: Vale

Sector: Mining

Conceptual engineering for the retrofitting of a ~6,450 sq ft (600 m²) warehouse into a production plant for recycled-based dust suppressants. Includes layouts, mechanical arrangements, flowcharts, and sustainable strategies (solar energy, water reuse, and waste management).